Travelodge Pass Through

Travelodge Pass Through

Walker Diggon demolished the last 4 rooms of the hotel block and built a bridge over top of the existing basement so visitors can access both sides of the property. This also allowed heavier trucks/equipment to have access as well. The pass through bridge was constructed up to Ontario bridge standards and also installed a small freight elevator so the Travelodge staff can accept deliveries at grade level and bring goods down to the basement for sorting. Lastly a fire exit was constructed at the end of the hotel and above the elevator for the hotel.

Project Information

  • Client: Niagara Clifton Group
  • Industry: Tourism & Hospitality
  • Date: 2022